Schedule a consultation
Resources / Support

The details.
All in one place.

Installation manuals, commissioning guidance, and product references for your Power Technology project.

Documentation library

Built for the
people building it.

Open or download the documents below. Match the manual to your equipment and configuration before beginning installation.

Product specifications

AC ICON 80A — Specifications

Technical specifications for AC ICON 80A, including single- and dual-port configurations.

PDF · 2.1 MB

Charger manuals

DC PLATINUM — Installation & Operation Manual

Model applicability requires confirmation: this document contains 480 kW technical data. Confirm the correct guide for a 120 kW installation with our team.

PDF · 7.0 MB · Version 1.4

DC HiPOWER — Installation & Operation Manual

Covers a power-cabinet and separate-dispenser system. Confirm applicability to your selected HiPOWER equipment.

PDF · 6.5 MB · Version 1.5

Installation & commissioning

Cable Management System — Installation Guide

Wall and pedestal cable-management guidance, including single and dual pedestal configurations. Confirm charger compatibility before installation.

PDF · 6.1 MB

Power Technology — Site Commissioning Guide

QR-code and project-code steps for binding stations to a charging site. Contact our team for your project code.

PDF · 0.5 MB

Product photo library.

Explore our product configurations. For additional technical specifications or a model-specific installation guide, contact our team.

Power Technology Single Pedestal — product photoIMAGE ↗Power Technology Dual Pedestal — product photoIMAGE ↗AC PREMIUM 50A — product photoIMAGE ↗AC PREMIUM PLUS 80A — product photoIMAGE ↗AC ICON Dual 80A — product photoIMAGE ↗AC ICON Dual Wall 80A — product photoIMAGE ↗DC ENHANCED 40 kW — product photoIMAGE ↗DC ENHANCED 40 kW Trolley — product photoIMAGE ↗DC PLATINUM 120 kW — product photoIMAGE ↗DC HiPOWER — product photoIMAGE ↗

Need a hand?

For help with a station, include the site address, charger ID, and a description of what you’re seeing.

Which installation guide should I use?

Use the guide matching the model and configuration on your equipment label and approved project documents. Contact our team if you need help confirming the right manual.

How do I get a project code?

Contact Power Technology support for the project code associated with your charging site. The commissioning guide explains how to use it to bind your stations.

Level 2 or DC fast charging?

Level 2 generally suits longer visits and overnight parking. DC fast charging is designed for shorter stops. The right choice depends on your driver needs and electrical infrastructure.